データセンター用のラックマウントAHFをインストールする方法: ステップバイステップガイド

今日のデジタル化された世界で, データセンターは、ITインフラストラクチャのバックボーンです. しかし, サーバーなどの非線形負荷の使用が増加すると, UPSシステム, and cooling systems, data centers are increasingly vulnerable to harmonic distortion and power quality issues. A reliable rack-mounted Active Harmonic Filter (AHF) is an efficient solution to ensure smooth operations, minimize power loss, and protect mission-critical equipment.

データセンター用のラックマウントAHF

This article explains how to install a rack-mounted AHF module—like the Parallel Rack-Mounted AHF from CoEpower—in your data center safely and effectively.

Why Data Centers Need Rack-Mounted AHFs?

Rack-mounted AHFs are specifically engineered to integrate seamlessly into data center environments. They offer:

-Compact, space-saving design that fits standard server racks

-Real-time harmonic suppression for fluctuating loads

-Improved power factor and reduced THDi

-Easy parallel scalability for expanding infrastructure

CoEpower’s Parallel Rack-Mounted AHF is ideal for modular setups and critical power applications.

Step-by-Step Guide to Installing a Rack-Mounted AHF

1. Pre-Installation Checklist

Before installation, ensure the following:

Power system audit: Confirm harmonic levels and system compatibility

Rack compatibility: Verify the AHF module fits your rack (typically 19-inch standard)

Ventilation: Make sure there’s adequate airflow and cooling

Power ratings: Match AHF current capacity with your load requirements

Compliance: Ensure grounding and electrical codes are met

Tip: Refer to the user manual provided by COE Power for exact specifications and guidelines.

2. Mounting the AHF Module

Secure mounting rails: Attach sliding or fixed rails in the desired rack position

Lift with caution: Use two-person lift or rack-mounting tools to insert the AHF safely

Fasten firmly: Secure the module with screws or latches to prevent vibration or movement

3. Electrical Connections

Input/Output Wiring: Connect to the three-phase system as specified

Neutral and PE (Protective Earth): Always ground the unit for safety

CT (Current Transformer) Placement: Install CTs on the main supply line (preferably load side of AHF) and ensure proper polarity

Important: Incorrect CT orientation or placement can result in ineffective compensation.

4. Commissioning & Configuration

Power On Sequence: Follow startup instructions step-by-step

System Configuration: Using the AHF’s touchscreen or software interface, input:

CT ratio

Harmonic compensation mode (select automatic or manual)

Desired THDi limit or power factor target

Parallel Mode (if applicable): Connect multiple AHF units and configure parallel operation using communication ports (RS485, イーサネット)

5. Testing and Monitoring

Perform load tests: Gradually apply load and observe real-time harmonic suppression

Verify compensation: Use a power analyzer to confirm THDi reduction

Enable alarms: Set thresholds for overload, temperature, and communication faults

Remote Monitoring: Integrate into BMS or SCADA system if available

6. Maintenance Tips

Routine inspection: Check air filters, fan status, and terminals

Firmware updates: Keep software and firmware up to date via COE Power’s support portal

Service intervals: Follow the manufacturer’s recommended schedule for internal checks and cleaning

Why Choose CoEpower’s Rack-Mounted AHF Module?

CoEpower’s Parallel Rack-Mounted AHF is designed with plug-and-play ease, modular scalability, and precision harmonic filtering. Key benefits include:

Compact design for IT racks

Real-time adaptive filtering

Simple parallel expansion

Support for industrial communication protocols

High efficiency with THDi < 5%

Installing a rack-mounted AHF is not just about hardware—it’s about enhancing the long-term resilience and efficiency of your data center’s power infrastructure. Whether you’re upgrading an existing system or building a new server room, investing in a scalable and high-performance AHF like CoEpower’s module can significantly boost operational reliability.

✅ For expert consultation or product inquiries, visit CoEpower’s official page: https://www.coepowers.com/

タグ: rack mounted AHF, data center power quality, AHF installation guide, parallel AHF module, harmonic filter for data centers, CoePower AHF, 電力品質のソリューション, modular AHF installation, アクティブハーモニックフィルター, rack-mounted harmonic filter, Rack-mounted active harmonic filter, How to install AHF in data centers, AHF for server racks, Harmonic filtering for IT infrastructure, Parallel AHF module, CoEpower rack-mounted filter, Data center power quality solution, AHF installation step-by-step guide.

投稿を共有します:

関連投稿

Cookieの設定を更新します

簡単な見積もりを求めてください

内でご連絡いたします 1 営業日, 接尾辞を使用して電子メールに注意してください 「sales@coepower.com」.