AHF & SVG 전력 품질 솔루션

AHF & SVG 전력 품질 솔루션

Power quality made simple for Office Buildings, 학교 & 암호화 광업 농장 - 고조파를 줄입니다, 올바른 전력 계수, stabilize voltage, and unlock capacity.

Clean power for reliable operations and measurable ROI.

전력 품질이 중요한 이유

배음, low power factor (pf), voltage fluctuations, and three‑phase unbalance increase losses, cause overheating, trigger nuisance trips, and shorten equipment life. Fixing these issues quickly reduces penalties, improves energy efficiency, and frees 10–30% extra capacity on existing infrastructure.
  • Lower energy and demand charges; fewer penalties
  • Cooler transformers/cables; fewer trips and downtime
  • Better performance for VFDs, UPS, LED, and sensitive loads
  • Supports compliance with IEEE 519 / GB/T 14549 objectives

Our Solutions at a Glance

AHF — Active Harmonic Filter

Targeted harmonic mitigation for non‑linear loads (예를 들어, VFD, SMPS, LED). Typical THDi reduction to ≤5–8% with proper sizing.
  • 가장 좋습니다: Harmonics‑dominant sites
  • Response: ms‑level dynamic injection
  • 능률: typically ≥97%

APF — Active Power Filter

All‑in‑one: 배음 + reactive power + three‑phase unbalance. PF up to 0.99, neutral current reduction, voltage stability support.
  • 가장 좋습니다: Mixed issues with PF/unbalance
  • Response: sub‑cycle control
  • Scalable: modular parallel design

SVG — Static VAR Generator

Fast, precise reactive power compensation (lag/lead) 에게 0.99 pf. Helps mitigate flicker and stabilizes feeders.
  • 가장 좋습니다: PF penalties and voltage stability
  • Response: real‑time, ms‑level
  • 완성: Modbus RTU/TCP
특징 / NeedAHFSVG
고조파 완화Excellent제한된
전력 계수 보정ExcellentExcellent
Three‑phase unbalanceExcellent제한된
Typical use caseHarmonics onlyPF only / flicker

Office Buildings — Power Quality Tenants Feel, Finance Teams Love

Cut harmonics, eliminate PF penalties, and free capacity for tenant growth—without disrupting operations.

Pain Points

  • Nuisance trips and elevator/HVAC disturbances from harmonics/unbalance
  • PF penalties and rising demand charges
  • LED/VFD stress overheating transformers and busbars
  • Capacity bottlenecks blocking tenant expansion and green goals

Our Solution

  • AHF: Targeted harmonic mitigation for VFDs, LED, UPS; THDi to ≤5–8% (site‑dependent)
  • SVG: Fast PF correction (lag/lead) for lower bills and utility compliance

이익

  • Fewer trips; cooler transformers; quieter operation
  • Lower losses and penalties; unlock 10–30% headroom
  • Stable elevators, HVAC, and tenant critical equipment

Quick Sizing Example

Bus 2500 에이, thdi 28% → target 8%, safety factor 1.3 Compensation current ≈ 2500 × (0.28 0.08) × 1.3 650 에이 Recommendation: 2 × 300 에이 + 1 × 100 에이 (redundant and scalable)Request a Quote
Clean power for elevators, HVAC, and tenant IT rooms.

학교 & Campuses — Keep Classes On, Keep Costs Down

Stabilize labs, data rooms, and HVAC with clean power—meet sustainability goals without disrupting semesters.

Pain Points

  • Sensitive lab gear and IT rooms affected by harmonics and voltage dips
  • PF penalties and tight public budgets
  • Stadium lighting and workshops causing flicker and THD spikes
  • Limited maintenance windows; strict noise expectations

Our Solution

  • AHF: Reduce harmonics from HVAC VFDs, LED 조명, lab PSUs; THDi to ≤5–8%
  • SVG: PF to 0.99 (lag/lead), supports flicker mitigation for lighting/events

이익

  • Fewer disturbances in classrooms, labs, and IT spaces
  • Lower utility costs and measurable CO₂ reduction
  • More usable transformer capacity for expansion

Quick Sizing Example

Feeder 1200 에이, thdi 30% → target 8%, safety factor 1.25 Compensation current ≈ 1200 × (0.30 0.08) × 1.25 330 에이 Recommendation: 2 × 200 A modules for growth and redundancyRequest a Quote
Quiet, efficient, and reliable power for education.

Crypto Mining Farms — More Uptime, Lower Losses, Better Compliance

Mitigate harmonics from miner PSUs, correct PF in real time, and cool down your transformers—boost ROI and stay grid‑friendly.

Pain Points

  • High THDi from SMPS overheating cables/transformers
  • PF penalties and capacity caps from utilities
  • Voltage dips and trips during ramp‑up/batch restarts
  • Harsh sites with dust, heat; containerized layouts

Our Solution

  • AHF: Target miner harmonic spectrum; THDi to ≤5–8% (with proper sizing)
  • SVG: PF to 0.99 (lag/lead); stabilizes voltage and reduces flicker on long feeders

이익

  • Fewer trips; lower I²R losses; cooler transformer temps
  • Free 10–30% capacity headroom to add rigs without upgrades
  • Utility compliance support (IEEE 519 objectives at PCC)

Quick Sizing Example

Main LV bus 4000 에이, thdi 35% → target 8%, safety factor 1.3 Compensation current ≈ 4000 × (0.35 0.08) × 1.3 1404 에이 Recommendation: 5 × 300 에이 (1500 A total) for margin and N+1 flexibilityRequest a Quote
Stability and efficiency for 24/7 operations.

Typical Specs & 완성

  • Voltages: 380/400/415/480/690 다섯; 50/60 HZ; 3‑phase 3/4‑wire
  • 용량: 50–1200 A per cabinet; parallel to multi‑kA
  • Performance: THDi ≤5–8% (site dependent); PF up to 0.99 (lag/lead)
  • Response: sub‑cycle control, ms‑level correction; efficiency typically ≥97%
  • Communications: Modbus RTU/TCP; dry contacts; cloud‑ready options
  • Enclosures: Indoor; outdoor options on request; typical noise 55–65 dB
  • Standards: Designed to help achieve IEEE 519 / GB/T 14549 objectives

Case‑Style Examples

VFD Workshop

THDi cut from 32% 에게 7%; PF lifted to 0.99; transformer temperature reduced; fewer nuisance trips.

Commercial Tower

PF penalties eliminated; 15% headroom unlocked for tenant expansion; quieter HVAC operation.

EV Charging Plaza

Voltage dip and flicker improved during peak demand; fewer breaker trips; higher station uptime.

FAQ

Will this help me meet IEEE 519 at the PCC?We size and configure the solution to your specified limit (예를 들어, THDi ≤5–8% at the PCC), subject to proper installation and verified site measurements.
AHF vs SVG — which is most cost‑effective?If harmonics dominate, choose AHF. If you also need PF and unbalance correction, choose APF. If PF is the main issue, SVG typically offers the best value.
Can I start small and expand?예. Our modular systems parallel seamlessly, so you can start with a smaller capacity and scale with load growth.
How long does installation take?Many projects complete within hours to a few days depending on switchgear, cable runs, and commissioning scope.
What maintenance is required?Minimal routine checks (filters, airflow, connections). Remote diagnostics and predictive alerts are available.
Noise considerations for offices/schools?Typical cabinet noise is 55–65 dB depending on rating and cooling; placement and ventilation design help meet acoustic targets.

Request Pricing & Free Assessment

Share your single‑line diagram (if available), key loads, measured THDi/PF, and target KPIs. We’ll respond with a tailored AHF/SVG proposal, performance commitments, lead time, and a competitive quotation.

팁: Include voltage & wiring (예를 들어, 400 다섯, 3P4W), transformer/feeder current (에이), measured THDi/PF at PCC, target limits (예를 들어, IEEE 519 @ PCC), site city/country, preferred installation window.

COE Powers — AHF, APF & SVG power quality solutions for commercial and industrial sites.